Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2 3 4 5 6 7 8 9 10 11      
PGVCL A(i) Loose connections from pole 230 67468 67698 29921 35028 2547 17 67513 185
A(ii) Interruption due to line breakdown 117 12953 13070 4630 8010 309 6 12955 115
A(iii) Interruption due to failure of transformer 147 5648 5795 2580 2864 214 0 5658 137
B(i) Ordinary case, which requires no augmentation. 28 4781 4809 593 4160 28 0 4781 28
B(ii) Where augmentation is required. 14 637 651 250 364 23 0 637 14
C(i) Stopped/Defective Meters 271 8253 8524 3104 4880 272 0 8256 268
C(ii) Billing on average basis for more than two bills 26 2851 2877 1157 1604 85 4 2850 27
D(i) Loose Wires 112 3208 3320 885 2194 129 0 3208 113
D(ii) Inadequate ground clearance 15 761 776 232 514 15 0 761 15
E(i) For current bills where no additional information is required 0 5980 5980 1933 3905 142 0 5980 0
E(ii) Where additional information relating to correctness of reading etc. is required 177 2060 2237 849 1192 19 0 2060 178
F(i) Where extension of mains is not required 0 3091 3091 1051 1977 63 0 3091 1
F(ii) Where extension of mains is required 18 2452 2470 439 1999 14 0 2452 18
F(iii) Modification in connected load 81 1301 1382 529 756 16 0 1301 81
F(iv) Name change/reconnection 828 10268 11096 5733 4294 241 0 10268 829
G Refund of amount due in regard to temporary connection 66 756 822 406 351 16 0 773 49
H Others 25 1321 1346 717 581 26 0 1324 23