| Performa SoP 003 B: APPENDIX-B (already in the SoP regulation) | ||||||||||||||
| REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE | ||||||||||||||
| Name of Area / Circle | Classification | Pending complaints of previous Qtr | Complaints received during the Qtr | Total Complaints | No. of Complaints redressed during the Qtr | Balance Complaints to
be redressed (5) – (10) |
||||||||
| In stipulated time | Beyond stipulated time | Total (6) to (9) | ||||||||||||
| Within 50% of stipulated time. | Within stipulated time. | Up to double the stipulated time | More than double the stipulated time | |||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | ||||
| PGVCL | A(i) | Loose connections from pole | 230 | 67468 | 67698 | 29921 | 35028 | 2547 | 17 | 67513 | 185 | |||
| A(ii) | Interruption due to line breakdown | 117 | 12953 | 13070 | 4630 | 8010 | 309 | 6 | 12955 | 115 | ||||
| A(iii) | Interruption due to failure of transformer | 147 | 5648 | 5795 | 2580 | 2864 | 214 | 0 | 5658 | 137 | ||||
| B(i) | Ordinary case, which requires no augmentation. | 28 | 4781 | 4809 | 593 | 4160 | 28 | 0 | 4781 | 28 | ||||
| B(ii) | Where augmentation is required. | 14 | 637 | 651 | 250 | 364 | 23 | 0 | 637 | 14 | ||||
| C(i) | Stopped/Defective Meters | 271 | 8253 | 8524 | 3104 | 4880 | 272 | 0 | 8256 | 268 | ||||
| C(ii) | Billing on average basis for more than two bills | 26 | 2851 | 2877 | 1157 | 1604 | 85 | 4 | 2850 | 27 | ||||
| D(i) | Loose Wires | 112 | 3208 | 3320 | 885 | 2194 | 129 | 0 | 3208 | 113 | ||||
| D(ii) | Inadequate ground clearance | 15 | 761 | 776 | 232 | 514 | 15 | 0 | 761 | 15 | ||||
| E(i) | For current bills where no additional information is required | 0 | 5980 | 5980 | 1933 | 3905 | 142 | 0 | 5980 | 0 | ||||
| E(ii) | Where additional information relating to correctness of reading etc. is required | 177 | 2060 | 2237 | 849 | 1192 | 19 | 0 | 2060 | 178 | ||||
| F(i) | Where extension of mains is not required | 0 | 3091 | 3091 | 1051 | 1977 | 63 | 0 | 3091 | 1 | ||||
| F(ii) | Where extension of mains is required | 18 | 2452 | 2470 | 439 | 1999 | 14 | 0 | 2452 | 18 | ||||
| F(iii) | Modification in connected load | 81 | 1301 | 1382 | 529 | 756 | 16 | 0 | 1301 | 81 | ||||
| F(iv) | Name change/reconnection | 828 | 10268 | 11096 | 5733 | 4294 | 241 | 0 | 10268 | 829 | ||||
| G | Refund of amount due in regard to temporary connection | 66 | 756 | 822 | 406 | 351 | 16 | 0 | 773 | 49 | ||||
| H | Others | 25 | 1321 | 1346 | 717 | 581 | 26 | 0 | 1324 | 23 | ||||