TENDERS FROM PORBANDAR CIRCLE

SR

DESCRIPTION

ESTIMATED AMOUNT

LAST DATE & TIME

TENDER DOWNLOAD

1 Goods Loading & Unloading Work For Keshod Division Store 3,60,000.00 4/09/2010 times:15.00 Hrs Click Here
2

Supply of 200 Amp SMC Kit-Kat Fuse Distribution Box made of Thermosetting Plastic i.e. Glass Reinforced polyester sheet molding compound (SMC) confirming to IS: 13410:1992 and as per drawing for Circle Office, Porbandar. DIMENSION:- Minimum Size of Box) (1)Internal:700x480x210 (2)Internal Thickness :2 MM

3,00,000/- Dt 21/09/2010 times: 15.00 Hrs Click Here
3

Erection & Maintains of 11 KV HT/LT & T/C for Mangrol (R) Sub Division, Mangrol (T) Sub Division, Madhavpur Sub Division, Chorwad    Sub Division, Chorwad    Sub Division, Division office Mangrol ** Hiring of Diesel Driven close Body vehicle 24 hours for Chorwad S/Dn under This  Division ** Hiring of Diesel Driven close Body vehicle 24 hours for Division office

-- Dt 23/09/2010 times: 15.00 Hrs Click Here
4

Supply of Providing and fixing of heat shrinkable outdoor cable type termination type suitable for 11KV XLPE power cable 3*185mm2 of ISI standard for various subdivision under  city division porbandar. ** Supply of 200 Amp SMC kit-kat fuse distribution box made of thermosetting plastic for city division porbandar ** Supply of 200 Amp SMC kit-kat fuse distribution box made of thermosetting plastic for city division porbandar. ** Supply of D.O. Fuse Elements & T.C. Fuse Wire for all s/dn under city division Porbandar. ** N.D. SCHEME WORK FOR COSTAL SUB-DIVISION UNDER CITY DIVISION PORBNADAR. ** Work of shifting of HT/LT/TC for the purpose of widening of road by N.H.A.I. for 0 to 2.00km at porbandar city under Kamala bag and other sub-division areas of city division porbandar.

-- Dt 20/09/2010 times: 15.00 Hrs Click Here
5

Fabrication of Guy Rod, Tighting Rod, Turn Buckle, Guy Clamp,V Cross Arm,Top Clamp,D Clamp,C Clamp,LT Cross Arm,S/S Set/Tapping Angle,D P Set as per our Drawing & Standard Specifications

2,00,000/-

16-09-2010  Time  15:00  Hrs

Click Here
6

Material Loading & Unloading Works In Rural Division Store

1,00,000 /-

16-09-2010  Time  15:00  Hrs

Click Here

     

 

BACK