TENDERS FROM ANJAR CIRCLE

SR

DESCRIPTION

ESTIMATED AMOUNT

LAST DATE & TIME

TENDER DOWNLOAD

1

ERECTION OF HT/LT/TC AND LINE MAINT. WORK (PART-A) THROUGH IN ND,SPA,SI,SKJY, SSVY,DISS & RDSS SCHEME ADIPUR SDN. (TIME LIMIT 1 YEAR)
ERECTION OF HT/LT/TC AND LINE MAINT. WORK (PART-B) THROUGH IN ND,SPA,SI,SKJY, SSVY,DISS & RDSS SCHEME ADIPUR SDN.(TIME LIMIT 1 YEAR)
ERECTION OF HT/LT/TC AND LINE MAINT. WORK FOR ND,COASTAL,SI & AND ALL SCHEME UNDER RAMBAUG SDN. (TIME LIMIT 1 YEAR)
REMOVAL OF HT LINE CROSSING FOR SAFETY PURPOSE FOR ALL SCHEME UNDER KFTZ SDN. (TIME LIMIT 1 YEAR)
PILFER PROOFING OF TRANSFORMER CENRE INCLUDING ALL MATERIAL AND LUGS FOR RADHE IND, CHUDVA IND,IOC IND FOR SI SCHEME UNDER RAMBAUG SDN. (TIME LIMIT 1 YEAR)
RE TENDER FOR SUPPLY OF MINERAL DRINKING WATER UNDER GANDHIDHAM DIVISION & ALL SUB DIVISION UNDER GANDHIDHAM DIVISION EXCLUDING GST. (TIME LIMIT 1 TEAR) (2 ND ATTEMPT).
RE TENDER FOR LOADING, UNLOADING AND STACKING OF VARIOUS STORE MATERIALS UNDER GANDHIDHAM DIVISION. (TIME LIMIT 1 TEAR)
PROVIDING AND REPLACEMENT OF 1-PH, 3-PH METER, SL,MMB AND TC METER WORK IN ALL SCHEME WORK (PART-B) UNDER GANDHIDHAM SDN. (TIME LIMIT 1 TEAR)
REPLACEMENT OF FAIL DIST. TRANSFORMER 25/63/100KVA & AUGMENTAION-DUGMENTATION TC INCLUDING TRANSPORTATION AND CREDIT OF FAIL TRANSFORMER AT DIVISION STORE UNDER ANJAR RURAL-1 SDN.
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER MEGHPAR SDN.
LABOUR WORK FOR FABRICATION (ITEMWISE) AS PER NEW DRAWING AND SPECIFICATION UNDER ANJAR DIVISION.
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-1 SDN.
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER MEGHPAR SDN.
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN.
ERECTION OF BORE TYPE EARTHING FOR LST UNDER ANJAR RURAL-1 SDN
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-1 SDN (PART-A)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-1 SDN (PART-B)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-1 SDN (PART-C)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-1 SDN (PART-D)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-2 SDN (PART-A)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-2 SDN (PART-B)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-2 SDN (PART-C)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR RURAL-2 SDN (PART-D)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER MEGHPAR SDN (PART-A)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER MEGHPAR SDN (PART-B)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER MEGHPAR SDN (PART-C)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER MEGHPAR SDN (PART-D)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN (PART-A)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN (PART-B)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN (PART-C)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN (PART-D)
REPLACEMENT OF FAIL DIST. TRANSFORMER 25/63/100KVA & AUGMENTAION-DUGMENTATION TC INCLUDING TRANSPORTATION AND CREDIT OF FAIL TRANSFORMER AT DIVISION STORE UNDER ANJAR RURAL-2 SDN
PROVIDING 1 PHASE & 3-PHASE NEW CONNECTION & MAINT. WORK UNDER ANJAR RURAL-1 SDN
PROVIDING 1 PHASE & 3-PHASE NEW CONNECTION & MAINT. WORK UNDER ANJAR TOWN SDN
PROVIDING & LAYING OF UNDERGROUND 11KV XLPE CABLE & CABLE JOINT WORK UNDER ANJAR RURAL-2 SDN
PROVIDING & LAYING OF UNDERGROUND 11KV XLPE CABLE & CABLE JOINT WORK UNDER ANJAR RURAL-1 SDN
PROVIDING & LAYING OF UNDERGROUND 11KV XLPE CABLE & CABLE JOINT WORK UNDER ANJAR TOWN SDN
PROVIDING & LAYING OF UNDERGROUND 11KV XLPE CABLE & CABLE JOINT WORK UNDER MEGHPAR SDN
SECURITY GAURDS FOR THE PROTECTION OF VITAL INSTALLATIONS AND INSTALLATION CHECKING & O&M SQUARD UNDER ANJAR CIRCLE.
REQUIREMENT OF 11 KV LST SWITCH (SET ) SUITABLE,IDMT RELAY, CT COIL,2 CORE X 2.5 SQMM COPPER CABLE FLEXIBLE UNDER ANJAR DO.
REQUIREMENT OF MALE FEMALE CONTECT FOR LSTC SWITCH (1+2) & AB SWITCH (1+1) FOR S/DN OF ANJAR DO.
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER BHACHAU SDN PART -1 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER BHACHAU SDN PART -2 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER SAMKHIYALI SDN PART -1 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER SAMKHIYALI SDN PART -2 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER RAPAR SDN PART -1 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER RAPAR SDN PART -2 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER BHIMASAR SDN PART -1 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER BHIMASAR SDN PART - 2 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER BALASAR SDN PART -1 (12 MONTHS)
ERECTION OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER BALASAR SDN PART -2 (12 MONTHS)
RETENDER OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER SAMKHIYALI SDN PART -2 (12 MONTHS) 2ND ATTEMPT.
RETENDER OF HT-LT LINE & TC MAINTENANCE & NEW CONNECTION WORK FOR DIFFERENT SCHEME UNDER SAMKHIYALI SDN PART -3 (12 MONTHS) 2ND ATTEMPT.
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER BHACHAU SDN PART -1. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER BHACHAU SDN PART -2. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER SAMKHIYALI SDN PART -1. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER SAMKHIYALI SDN PART -2. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER RAPAR SDN PART -1. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER SAMKHIYALI SDN PART -2. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER BALASAR SDN PART -1. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER BALASAR SDN PART -2. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER BHIMASAR SDN PART -1. (TIME LIMIT 12 MONTHS)
PILFERPROFFING OF TRANSFORMER CENTER UNCLUDING ALL MATERIAL AND LUGS UNDER BHIMASAR SDN PART -2. (TIME LIMIT 12 MONTHS)
Time Limit Ext 21.05.2022
Time Limit Ext 31.05.2022
Time Limit Ext 10.06.2022
Time Limit Ext 21.06.2022

--

1 to 3, 9 to 14,16 to 39,42 to 53
ONLINE - 11.05.2022

PHYSICAL- 20.05.2022

 

4 to 8,15,40,41,
54 to 63

PHYSICAL- 20.05.2022

 

CLICK HERE
2

RE TENDER OF VEHICLE CAMPER FOR LINE FAULT ATTEND & MAINTENANCE WORK UNDER BHACHAU S/DN (WITH INSTALLATION OF GPS TRACKER) 24 HRS TIME LIMIT 24 MONTH 2ND ATTEMPT.
RE TENDER OF HIRING OF VEHICLE TRUCK/TEMPO FOR BHACHAU DIVISION OF 7.5 MT (WITH INSTALLATION OF GPS TRACKER) 2ND ATTEMPT
HIRING OF VEHICLE CLOSE BODY BOLERO ZEEP UNDER BHIMASAR S/DN FOR 24 HRS 24 MONTH (WITH INSTALLATION OF GPS TRACKER)
FABRICATION WORK UNDER BHACHAU DO. TIME LIMIT 12 MONTHS
RE TENDER OF SUPPLY, INSTALLATION , TESTING AND COMMISSIONING OF PIPE IN CAGE(PIC) EARTHING SYSTEM FOR TRANSFORMER CENTER OF SKY FEEDER AND CONNECTION TO VARIOUS PARTS OF TRANSFORMER CENTER USING GI STRIP AND GI NUT BOLTS 4TH ATTEMPT.
PROVIDING NEW CONNECTION AND REPLACEMENT OF 1 & 3 PHASE METER UNDER BHACHAU S/DN (TIME LIMIT 12 MONTHS)
PROVIDING NEW CONNECTION AND REPLACEMENT OF 1 & 3 PHASE METER UNDER SAMKHIYALI S/DN
HIRING OF VEHICLE CAMPER FOR LINE FAULT ATTEND & MAINTENANCE WORK UNDER RAPAR S/DN (WITH INSTALLATION OF GPS TRACKER) 24 HRS TIME LIMIT 24 MONTH.
VARIOUS FABRICATION WORK UNDER GANDHIDHAM DIVISION OFFICE FOR ONE YEAR EXCLUDING GST
ERECTION OF HT LT TC & LINE MAINTENANCE WORK FOR ND WORK & ALL SCHEME UNDER GANDHIDHAM S/DN FOR ONE YEAR
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,COASTAL, SI, AND ALL SCHEME UNDER RAMBAUG SDN (TIME LIMIT YEAR) 2ND ATTEMPT
BILL PRINTING & BINDING UNDER GANDHIDHAM DO EXCLUDING GST (TIME LIMIT 6 MONTHS)
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN (PART-C) 3RD ATTEMPT
ERECTION OF HT/LT/TC AND MAINT. WORK IN ND,SPA,SI,SKJY,AND ALL SCHEME UNDER ANJAR TOWN SDN (PART-D) 3RD ATTEMPT
PROVIDING 1 PHASE & 3-PHASE NEW CONNECTION & MAINT. WORK UNDER ANJAR RURAL-1 SDN 3RD ATTEMPT
PROVIDING 1 PHASE & 3-PHASE NEW CONNECTION & MAINT. WORK UNDER ANJAR TOWN SDN 3RD ATTEMPT
LABOUR CHARGES FOR LOADING & UNLOADING OF VARIOUS STORE MATERIALS WORK UNDER ANJAR DIVISION STORE
Time Limit Ext 24.06.2022
Time Limit Ext 05.07.2022

--

1 to 5, 8,10 to 17  ONLINE - 16.06.2022PHYSICAL- 24.06.2022

6,7, 9 & 12
PHYSICAL- 24.06.2022

CLICK HERE